Pagsisimula ng Major Renovation ng Child’s Hope sa Pasig
GROUNDBREAKING FOR THE MAJOR RENOVATION AND CONVERSION OF PCCH (CHILDS HOPE) INTO A GENERAL HOSPITAL, "Pasig City Hope Medical Center" MAIN OBJECTIVE: To add more medical services. Mas marami itong masisilbihan na Pasigueño bilang general hospital. HIGHLIGHTS: 1. Expansion of ER; 2. Expansion for adult medical, surgical and OB-GYN services; 3. Improvement of of Pediatric services. The building is 7 floors plus basement and upper roof deck. 1,600 sqm building foot print, 12,800 sqm floor area 600 days ang construction period nito (total ~315M). MORE DETAILS ON THE SCOPE OF WORK Additional rooms/works as per DOH standards, INCLUDING: 1. Extension of Emergency Room (from 4 beds to 13 beds plus 5 beds treatment and isolation area) 2. Pediatric and medical ICU (from 9 beds to 13 beds) and 15 beds for neonatal ICU 3. 2 bed Labor Room and 2 bed High-risk Pregnancy Unit 4. 3 beds, Delivery Room 5. New 2 Operating Rooms and Recovery Room 6. Sterilization/ Autoclave Room 7. Blood Bank Unit 8. 12 units for Hemodialysis 9. Additional 3 beds room at ward extension and rehabilitation of all ward 10. 12 bed ward extension at lower deck 11. Social Service Section 12. Additional 4 treatment areas for Physical Therapy Section 13. Improvement of Pharmacy 14. Improvement of Dietary and Nutrition Clinic at lower deck 15. Extension of Clinical and Molecular Laboratory 16. Additional Nurse Stations 17. Doctor’s quarters at lower deck 18. Improvement of Diagnostic and Radiology Rooms 19. New Admitting Counters 20. Finance Department room 21. Recovery Room 22. Sterile Room 23. Storage Facility at basement 24. Replacement of Ceiling 25. Waterproofing of basement, ledges, roof deck and upper decks and all other leaks 26. Flooring: Industrial Power floor self leveling compound and homogenous anti-bacterial Vinyl Roll with cove former, capping strip, etc. 27. Modular work stations 28. Built-up cabinets 29. Improvement of all comfort rooms 30. Medical Gas Piping 31. Plumbing Works (water lines and sewerage lines) 32. Electrical Works (upgrading, rewiring, and replacement of fixtures) 33. Mechanical Works (Air-conditioning of entire building – VRF) 34. Fire Detection and Alarm System (FDAS) 35. CCTV) system 35. Public Address System 36. Building Management System #PasigCity #ChildsHope #PasigHope