Pagsusuri ng mga Natapos

Pagsusuri ng mga Natapos na Proyekto sa Nagpayong

INSPECTION OF COMPLETED INTERIOR ROAD PROJECTS IN NAGPAYONG (7.18.22 / Part 1 of 2) Gaya ng sabi natin dati, inuna lang muna ang Kenneth Rd (dahil main road, dekada nang di napapagawa, at doon ikakabit ang drainage ng maraming HOA). Nung natapos ang Kenneth, inumpisihan agad at iniisa-isa natin ngayon ang mga interior roads/drainage sa Nagpayong. (1) New Paradise HOA 1-road Length= 122m, Width=4m Chb canal= .50m-wide (2) Mangga St. and Mangga Ext, Lakeview HOA L=180m W=4m Chb canal= .40m-w (3) Villa Isabel and Villa Cresencia L=527m, W=5m Chb canal= .40m -w (4) LAKSAMAH L=330m, W=3m Chb canal= .40m -w (5) Block 23 L=490, W=4m 4 roads Chb canal= .50m-w (6) Estacio Pagkalinawan HOA – Roads 1, 2, and 3 L=313m W=4.2m Chb canal= .40m-w 5 more roads for inspection tomorrow. Others under construction, some with planning division. Kasama ko kanina ang Engineering Department, Cong Roman Romulo, Kap Maricar Asilo Vivero at Barangay, VM Dodot at Sangguniang Panlungsod. #UmaagosAngPagasa #Infrastructure

ImageImageImageImage